Index

3.5-inch drive
3.5-Inch Disk Drives
configuring
Configuring Drives
connector
Drive Controller Connectors
differential
cabling rackmounted
Cabling the Differential 3.5-Inch Drive Controller
cabling tower
Cabling the Tower
drive bay location
Drive Bay Locations
in, out
Drive Controller Connectors
installing
Installing 3.5-Inch Drives
verifying
Verifying Drive Installation
labels
Drive Controller Connectors
LEDs
Drive LEDs
marketing codes
3.5-Inch Disk Drives
not from Silicon Graphics
Installing 3.5-Inch Drives
numbering
3.5-Inch Disk Drives
3.5-Inch Disk Drives
replacing and adding
Replacing and Adding a Disk Drive Module
single-ended
cabling rackmounted
Cabling the Single-Ended 3.5-Inch Drive Controller
cabling tower
Cabling the Tower
sled
3.5-Inch Disk Drives
speed
Data Transfer Rates
termination
Drive Controller Connectors
Drive Controller Connectors
Drive Termination
warm swap
Warm Swapping Drives (Administrative Warm Swap)

5.25-inch drive
5.25-Inch Drives
cabling
rackmounted
Cabling the 5.25-Inch Drive Controller
tower
Cabling the Tower
configuring
Configuring Drives
connector
Drive Controller Connectors
drive bay location
Drive Bay Locations
installing
Installing 5.25-Inch Options
verifying
Verifying Drive Installation
LEDs
Drive LEDs
numbering
3.5-Inch Disk Drives
3.5-Inch Disk Drives
removing and adding
Removing and Adding a 5.25-Inch Drive Option
single-ended
Single-Ended and Differential Versions (3.5-Inch Drive Controller)
speed
Data Transfer Rates
termination
Drive Termination
Drive Controller Connectors

administrative warm swap
3.5-Inch Disk Drives
Warm Swapping Drives (Administrative Warm Swap)

cables
Configurations and Cabling for the 3.5-Inch Drive Controller

configuration
Configurations and Cabling for the 3.5-Inch Drive Controller

converter board, replacing
Replacing the Differential/Single-Ended Converter Board

daisy chaining
Adding a Second Origin Vault Expansion Option (One Host)
Adding a Second Host and Second Origin Vault Expansion Option
5.25-inch drive
Drive Controller Connectors

data rate
Data Transfer Rates

differential
Single-Ended and Differential Versions (3.5-Inch Drive Controller)
Cabling the Enclosure
cabling
rackmounted
Cabling the Differential 3.5-Inch Drive Controller
tower
Cabling the Tower
configuration
Configurations and Cabling for the 3.5-Inch Drive Controller
termination
Drive Termination

differential/single-ended converter board, replacing
Replacing the Differential/Single-Ended Converter Board

disk module
ordering
3.5-Inch Disk Drives
Origin200, Origin2000
3.5-Inch Disk Drives
single-ended
Single-Ended and Differential Versions (3.5-Inch Drive Controller)

DLT tape drive, installing
Installing the Drive(s) and the Peripheral Carrier

drive
numbering
3.5-Inch Disk Drives
See also 3.5-inch drive, 5.25-inch drive.
Data Transfer Rates
speeds
Data Transfer Rates

end cap
Installing the Origin Vault Enclosure in a Rack
Removing the Enclosure Door (Optional)
Securing the Enclosure in the Rack

fan, replacing
Replacing a Fan

feet, adjusting (swivelling)
Adjusting the Feet

grounding strap
Jumpering SCSI Device IDs

hot-pluggability
Replacing and Adding a Disk Drive Module

label, attaching to bottom-opening door
Securing the Enclosure in the Rack

LED
drives
Drive LEDs
power
Powering Off the Origin Vault Expansion Option

manuals, others needed
Structure of This Guide

mounting
ears
Preparing the Enclosure for the Origin2000 Rack or P-S-RACK
Installing the Origin Vault Enclosure in a Rack
See also rack brackets
Installing the Origin Vault Enclosure in a Rack
shelf
Installing the Origin Vault Enclosure in a Rack
installing
Installing the Mounting Shelf

Origin Vault
air flow
Operating Conditions
cabling to second host
Adding a Second Host to One Origin Vault Expansion Option
formats
Origin Vault Formats
operating conditions
Operating Conditions
powering off
Powering Off the Origin Vault Expansion Option
preparing for component replacement
Preparing the Option for Component Replacement
rackmounted
Origin Vault Formats
cabling
Cabling the Enclosure
door
Installing the Origin Vault Enclosure in a Rack
door:attaching
Securing the Enclosure in the Rack
power cord connection
Connecting to the Power Distribution Unit
securing in rack
Securing the Enclosure in the Rack
second, cabling
Adding a Second Origin Vault Expansion Option (One Host)
with second host
Adding a Second Host and Second Origin Vault Expansion Option
tower
Origin Vault Formats
cabling
Cabling the Tower
clearances
Choosing a Location for the Origin Vault Tower
Operating Conditions
location
Choosing a Location for the Origin Vault Tower
power circuit with Origin200
Operating Conditions
Choosing a Location for the Origin Vault Tower
power cord connection
Cabling the Tower
powering on
Turning On the Origin Vault Expansion Option
removing cover
Jumpering SCSI Device IDs
removing side panels
Jumpering SCSI Device IDs
unpacking
Unpacking the Origin Vault

Origin200
cabling
to rackmounted
Cabling the Differential 3.5-Inch Drive Controller
to tower
Cabling the Tower
two to one Origin Vault
Adding a Second Host to One Origin Vault Expansion Option
two to two Origin Vaults
Adding a Second Host and Second Origin Vault Expansion Option
power circuit
Cabling the Tower
Choosing a Location for the Origin Vault Tower
Operating Conditions
rackmounted
installing
Installing the Origin Vault Enclosure in a Rack

Origin2000
cabling
to rackmounted
Cabling the 5.25-Inch Drive Controller
Cabling the Differential 3.5-Inch Drive Controller
to tower
Cabling the Tower
Cabling the Tower
two to one Origin Vault
Adding a Second Host to One Origin Vault Expansion Option
two to two Origin Vaults
Adding a Second Host and Second Origin Vault Expansion Option
SCSI connector
Cabling the Enclosure

Origin2000 Rack
installing Origin Vault in
Securing the Enclosure in the Rack
Installing the Origin Vault Enclosure in a Rack
removing Origin Vault door
Removing the Enclosure Door (Optional)

other manuals needed
Structure of This Guide

P-S-RACK, installing Origin Vault in
Preparing the Enclosure for the Origin2000 Rack or P-S-RACK
Installing the Origin Vault Enclosure in a Rack
Securing the Enclosure in the Rack

PCI SCSI option
Cabling the Differential 3.5-Inch Drive Controller
Cabling the Single-Ended 3.5-Inch Drive Controller
Cabling the 5.25-Inch Drive Controller
Cabling the Tower

peripheral carrier
installing drives in
Installing the Drive(s) and the Peripheral Carrier
preparing
Preparing the Peripheral Carrier
reinserting into bay
Installing the Drive(s) and the Peripheral Carrier

power
button
Main Power Switch and Power Button
Powering Off the Origin Vault Expansion Option
Turning On the Origin Vault Expansion Option
cord, connecting
rackmounted
Connecting to the Power Distribution Unit
tower
Cabling the Tower
LED
Powering Off the Origin Vault Expansion Option
supply
checking
Checking the Power Supply
replacing
Replacing the Power Supply
switch
Installing 3.5-Inch Drives
Main Power Switch and Power Button
Turning On the Origin Vault Expansion Option
Powering Off the Origin Vault Expansion Option

rack brackets
Installing the Origin Vault Enclosure in a Rack
Attaching Rack Brackets to the Enclosure
See also mounting ears.
Installing the Origin Vault Enclosure in a Rack

rackmountable enclosure. See Origin Vault rackmounted.
Features of the Origin Vault Expansion Option

safety considerations
Safety Considerations

SCSI
backplane, replacing
Replacing the SCSI Backplane
cabling
rackmounted
Cabling the Single-Ended 3.5-Inch Drive Controller
tower
Cabling the Tower
channel agreement
Cabling the Tower
Cabling the Enclosure
connectors
Drive Controller Connectors
rackmounted
Cabling the Enclosure
tower
Cabling the Tower
ID
3.5-Inch Disk Drives
jumpering
Jumpering SCSI Device IDs
pins
Jumpering SCSI Device IDs
resetting
Jumpering SCSI Device IDs
See also differential, single-ended, 3.5-inch drive, 5.25-inch drive.
Cabling the Enclosure

scsiadminswap
Warm Swapping Drives (Administrative Warm Swap)

shelf for rack
Installing the Origin Vault Enclosure in a Rack
installing
Installing the Mounting Shelf

single-ended
Cabling the Enclosure
Single-Ended and Differential Versions (3.5-Inch Drive Controller)
cabling
rackmounted
Cabling the Single-Ended 3.5-Inch Drive Controller
tower
Cabling the Tower
configuration
Configurations and Cabling for the 3.5-Inch Drive Controller
disk module
Single-Ended and Differential Versions (3.5-Inch Drive Controller)
termination
Drive Termination

standalone tower. See Origin Vault tower.
Features of the Origin Vault Expansion Option

termination
Drive Termination
Configurations and Cabling for the 3.5-Inch Drive Controller
Drive Controller Connectors
Drive Controller Connectors

terminator
attaching
Adding a Second Origin Vault Expansion Option (One Host)
Cabling the Tower
Cabling the Differential 3.5-Inch Drive Controller
part number
Cabling the Differential 3.5-Inch Drive Controller
Cabling the Tower

third-party rack
installing Origin Vault in
Installing the Origin Vault Enclosure in a Rack
Preparing the Third-Party 19-Inch Rack for the Enclosure
removing Origin Vault door
Removing the Enclosure Door (Optional)

tower. See Origin Vault tower.
Features of the Origin Vault Expansion Option

transfer rate
Data Transfer Rates

Ultra SCSI board
cabling
Cabling the 5.25-Inch Drive Controller
Cabling the Differential 3.5-Inch Drive Controller
SCSI channels
Cabling the Enclosure

warm swap
Warm Swapping Drives (Administrative Warm Swap)
3.5-Inch Disk Drives