List of Figures

| Table of Contents | List of Figures | List of Tables |

Figure 1-1. Front View of the O2 Workstation
Figure 1-2. Rear View of the O2 R5000 Workstation
Figure 1-3. Rear View of the O2 R10000 Workstation
Figure 1-4. Side Panel Audio and Video Ports
Figure 1-5. O2 Workstation Parts
Figure 1-6. Connecting the Keyboard and Mouse to the Workstation
Figure 1-7. Connecting the Network Cable and the Camera to the Workstation
Figure 1-8. Connecting the Monitor to the Workstation
Figure 1-9. Connecting the Power Cables to the Monitor and to the Workstation
Figure 1-10. Turning On the Monitor and the Workstation
Figure 1-11. The Out of Box Experience
Figure 1-12. Turning the Workstation On or Off
Figure 1-13. Connecting the O2Cam to the Workstation
Figure 1-14. Front View of the O2Cam
Figure 1-15. Using the O2Cam's Built In Microphone
Figure 1-16. Setting Up the O2Cam on Your Monitor
Figure 1-17. Setting Up the Camera on Presenter 1280
Figure 1-18. Attaching the Lockbar to the Workstation
Figure 1-19. Sliding the Lockbar
Figure 1-20. Locking the O2 Workstation
Figure 1-21. Locating the Serial Number On the Rear
Figure 1-22. Locating the Serial Number Inside the Workstation
Figure 2-1. Turning Off the O2 Workstation
Figure 2-2. Disconnecting the Power Cables
Figure 2-3. Pulling Down the Lever on the System Module
Figure 2-4. Remove the System Module From the Chassis
Figure 2-5. Laying the System Module on a Flat Surface
Figure 2-6. Attaching the Wrist Strap
Figure 2-7. Locating the DIMM Banks
Figure 2-8. Top Down View of the DIMM Banks
Figure 2-9. Installing the Memory Modules
Figure 2-10. Checking the DIMM Installation
Figure 2-11. Attaching the Wrist Strap
Figure 2-12. Removing the Memory Module
Figure 2-13. Releasing the PCI Tray
Figure 2-14. Removing the PCI Tray
Figure 2-15. Removing the Screw and Filler Panel
Figure 2-16. Installing the PCI Board
Figure 2-17. Returning the Lever to its Starting Position
Figure 2-18. Replacing the PCI Tray in the System Module
Figure 2-19. PCI Tray Seated Correctly
Figure 2-20. Releasing the PCI Tray
Figure 2-21. Removing the PCI Tray
Figure 2-22. Removing the Screw and the PCI Board
Figure 2-23. Replacing the Filler Panel and Screw on the PCI Tray
Figure 2-24. Removing the Screw and Filler Panel
Figure 2-25. Installing the PCI Board on the R10000 Workstation
Figure 2-26. Securing the PCI Board
Figure 2-27. Removing the Screw That Secures the PCI Board
Figure 2-28. Replacing the Filler Panel and Screw
Figure 2-29. Presenter 1280/Stereo VIew Board
Figure 2-30. Releasing the PCI Tray
Figure 2-31. Removing the PCI Tray
Figure 2-32. Removing the Screws From the Face Plate
Figure 2-33. Removing the Face Plate From the System Module
Figure 2-34. Removing the PCI Tray From the R10000 System Module
Figure 2-35. Attaching the Wrist Strap
Figure 2-36. Removing the I/O Filler Panel
Figure 2-37. Positioning the Option Board
Figure 2-38. Aligning the Option Board
Figure 2-39. Seating the Option Board Viewed From the Side
Figure 2-40. Installing the Two Screws
Figure 2-41. Returning the Lever to its Starting Position
Figure 2-42. Replacing the PCI Tray in the System Module
Figure 2-43. PCI Tray Seated Correctly
Figure 2-44. Replacing the R10000 PCI Tray in the System Module
Figure 2-45. Replacing the Face Plate
Figure 2-46. Replacing Two Screws on the Face Plate
Figure 2-47. Replacing Five Screws on the Face Plate
Figure 2-48. Attaching the Wrist Strap
Figure 2-49. Removing the Display Adapter Board
Figure 2-50. Returning the System Module to its Upright Position
Figure 2-51. Reinstalling the System Module in the Chassis
Figure 2-52. Securing the System Module in Place
Figure 2-53. Connecting the Power Cable
Figure 2-54. Turning On the Workstation
Figure 2-55. The Toolchest
Figure 3-1. Turning Off the Workstation
Figure 3-2. Locating the Optional Drive Bay
Figure 3-3. Disconnecting the Power Cable and Other Cables
Figure 3-4. Releasing the Audio-Visual Module
Figure 3-5. Sliding Out the Audio-Visual Module
Figure 3-6. Removing the Panel From the Optional Drive bay
Figure 3-7. Installing the Second Hard Drive Module
Figure 3-8. Securing the Second Hard Drive Module
Figure 3-9. Reinstalling the Audio-Visual Module in the Chassis
Figure 3-10. Securing the Audio-Visual Module
Figure 3-11. Connecting the Power Cable and Other Cables
Figure 3-12. Turning on the Workstation
Figure 3-13. Turning Off the Workstation
Figure 3-14. Releasing the Optional Drive Module
Figure 3-15. Sliding the Second Hard Drive Out of the Chassis
Figure 3-16. Replacing the Filler Panel
Figure 3-17. Reconnecting the Cables
Figure 3-18. Turning Off the Workstation
Figure 3-19. Connecting One External Device to the Workstation
Figure 3-20. Turning Off the Workstation
Figure 3-21. Connecting More than One Device in a Daisy Chain
Figure 3-22. Locating the Serial Ports
Figure 3-23. Audio and Video Ports
Figure 4-1. Diagnostic Flow Chart #1 (Expand the Window to View)
Figure 4-2. Diagnostic Flow Chart #2 (Expand the Window to View)
Figure 4-3. System Diagnostic Tests
Figure 4-4. System Startup Notifier
Figure 4-5. Pressing the Reset Button
Figure 4-6. System Startup Notifier
Figure 4-7. System Recovery Menu
Figure 4-8. Turning off the Workstation
Figure 4-9. Attaching the Wrist Strap
Figure 4-10. Removing the Jumper
Figure 4-11. Installing the Jumper
Figure 5-1. Releasing the PCI Tray on the R5000 Workstation
Figure 5-2. Removing the PCI Tray
Figure 5-3. Attaching the Wrist Strap
Figure 5-4. Removing the Phillips Screws on the R5000 CPU Module
Figure 5-5. Removing the R5000 CPU Module
Figure 5-6. Installing the Replacement CPU Module
Figure 5-7.
Figure 5-8. PCI Tray Seated Correctly
Figure 5-9. Releasing the PCI Tray on the R5000 Workstation
Figure 5-10. Removing the PCI Tray
Figure 5-11. Attaching the Wrist Strap
Figure 5-12. Removing the Rectangular-Shaped Processor Module
Figure 5-13. Removing the L-Shaped Processor Module
Figure 5-14. Installing the L-Shaped Processor Module Upgrade
Figure 5-15.
Figure 5-16. PCI Tray Seated Correctly
Figure 5-17. Removing Seven Screws From the Face Plate
Figure 5-18. Removing the Face Plate From the System Module
Figure 5-19. Releasing the PCI tray From the System Module
Figure 5-20. Attaching the Wrist Strap
Figure 5-21. Removing the Screws From the R10000 CPU Module
Figure 5-22. Removing the R10000 CPU Module
Figure 5-23. Securing the R10000 CPU Module
Figure 5-24. Replacing the PCI Tray in the R10000 System Module
Figure 5-25. Replacing the Face Plate
Figure 5-26. Replacing Two Screws on the Underside
Figure 5-27. Replacing Five Screws on the Face Plate
Figure 5-28. Removing Seven Screws From the Face Plate
Figure 5-29. Removing the Face Plate From the System Module
Figure 5-30. Releasing the PCI Tray From the System Module
Figure 5-31. Attaching the Wrist Strap
Figure 5-32. Removing the Screws From the R10000 or R12000 CPU Module
Figure 5-33. Removing the R10000 or R12000 CPU Module
Figure 5-34. Removing the Top Screws from the CPU Support
Figure 5-35. Removing the Bottom Screw from the CPU Support
Figure 5-36. Installing the New CPU Support in the System Module
Figure 5-37. Reinstalling the Bottom CPU Support Screw
Figure 5-38. Securing the R12000A CPU Module
Figure 5-39. Replacing the PCI Tray in the R12000A System Module
Figure 5-40. Replacing the Face Plate
Figure 5-41. Replacing Two Screws on the Underside
Figure 5-42. Replacing Five Screws on the Face Plate
Figure 5-43. Turning Off the Workstation
Figure 5-44. Removing the Power Cables
Figure 5-45. Releasing the Drive Tray
Figure 5-46. Removing the System Drive Module From the Chassis
Figure 5-47. Installing the Replacement System Drive Module
Figure 5-48. Securing the System Drive Module
Figure 5-49. Reconnecting the Power Cable
Figure 5-50. Turning Off the Workstation
Figure 5-51. Removing the Cables From the Audio-Visual Module
Figure 5-52. Releasing the Audio-Visual Module
Figure 5-53. Removing the Audio-Visual Module From the Chassis
Figure 5-54. Installing the Replacement Audio-Visual Module
Figure 5-55. Securing the Audio-Visual Module
Figure 5-56. Reconnecting the Audio -Visual Cables
Figure 5-57. Turning on the Workstation
Figure 5-58. Turning Off the Workstation
Figure 5-59. Removing the Power Cable
Figure 5-60. Removing the Bezel From the Power Supply
Figure 5-61. Releasing the Power Supply
Figure 5-62. Removing the Power Supply From the Chassis
Figure 5-63. Installing the Replacement Power Supply
Figure 5-64. Locking the Power Supply in Place
Figure 5-65. Replacing the Bezel on the Power Supply
Figure 5-66. Reconnecting the Power Cable
Figure 5-67. Opening the CD-ROM Drive
Figure 5-68. Removing the CD-ROM Drive Face Plate
Figure 5-69. Removing the Power Supply Bezel
Figure 5-70. Removing the Top Cover of the CD-ROM Drive
Figure 5-71. Removing the Three Phillips Screws
Figure 5-72. Removing the Outer Cover
Figure 5-73. Removing the Screws From the CD-ROM Drive
Figure 5-74. Removing the CD-ROM Drive
Figure 5-75. Disconnecting the SCSI and Power Cables
Figure 5-76. Reconnecting the SCSI and Power Cables
Figure 5-77. Installing the Replacement CD-ROM Drive
Figure 5-78. Securing the CD-ROM Drive
Figure 5-79. Replacing the Outer Cover
Figure 5-80. Securing the Outer Cover
Figure 5-81. Replacing the Top Cover of the CD-ROM Drive
Figure 5-82. Replacing the Power Supply Bezel
Figure 5-83. Replacing the CD-ROM Face Plate
Figure 5-84. Reconnecting the Power Cable
Figure 5-85. The Stripped Down Workstation Chassis
Figure 6-1. Basic Parameters of Visual Display Terminal Workstation Adjustment (Adapted From ANSI/HFS 100-1988)
Figure A-1. Audio Ports Pinout Assignments
Figure A-2. S-Video (Analog ) Port Pinout Assignments